Project Description

KPA Consulting provided consulting services on a 50MW wind farm project located in Gharo area. The project utilized 2 MW wind turbines having 6.3kV output which was stepped to 22kV by the turbine transformer to feed in to the power collection network of the wind farm. The total output is delivered to a 132/22kV grid station having 2x30MVA transformers for linking the wind farm with the national grid.

KPA Consulting services included power collection network, grid station and related systems.

Visit Site