Security Papers Ltd, Karachi

Project Description

The project relates to reconfiguration of medium voltage network to achieve optimum utilization of captive generation and two KESC supplies. The project included modification and rehabilitation of 11kV and 400V network, switchgear, etc.

KPA Consulting introduced a highly sophisticated and versatile Power Management  System and robust Ring Main Units for achieving all switching functions at the medium voltage level.

On account of critical nature of all the facilities, the project required very careful design to achieve fault-tolerant system and it all required through planning and execution of project activities at site.

Visit Site