The CDA Headquarter building was envisioned as more than just public offices of the city government but the “Civic Center” or “City Hall” of Islamabad  where  the future of the city is envisioned and maintained. The design of the building was approached with sustainability and energy conservation as a central concept.

The 5MW building load is fed by WAPDA and backed up by 11kV 2.5MVA DG sets. Cast Resin 2.5MVA transformers increase fire safety and thus can be placed close to the load resulting in significant   savings.   The   400V   power   distribution   system comprises of cost-effective Aluminum bus-ways and Aluminum conductor XLPE insulated cables.

What Our team provided

ICT

Security
Safety Systems and infrastructure
Power generation and a Tier-4 Data Center