Project Description
The CDA Headquarter building was envisioned as more than just public offices of the city government but the “Civic Center” or “City Hall” of Islamabad where the future of the city is envisioned and maintained. The design of the building was approached with sustainability and energy conservation as a central concept.
The 5MW building load is fed by WAPDA and backed up by 11kV 2.5MVA DG sets. Cast Resin 2.5MVA transformers increase fire safety and thus can be placed close to the load resulting in significant savings. The 400V power distribution system comprises of cost-effective Aluminum bus-ways and Aluminum conductor XLPE insulated cables.