Atlas Engineering, Karachi

Project Description

KPA Consulting has been involved in two projects of AEL.

The first project involved a Study on captive generation, optimum utilization of generation and KESC, status of 11kV primary infrastructure consisting of cables, switch gears, transformers, etc.

The second project included the augmentation of 11kV network by replacing out-dated equipment and reconfiguration of network. The project also included a highly sophisticated Power Management System, testing of 11kV cables, etc

Visit Site